This was jus waiting to happen...the bridges were built over 50 years ago. With big truck traffic & oversize loads contributing to their decay.
TxDOT sez 4 years to finish replacing both bridges.....so expect at least 5.
All traffic will be routed to 1 bridge..probably the southbound side.
Speegleville Rd & China Spring FM1637 will undoubtedly bear the brunt of traffic increases. At least China Spring was 4 laned from FM185 into Waco...but the 185 bridge is still 2 lanes. Speegleville to US84 nope..still 2 lanes with plenty of mornin & evenin traffic
The next project should be the long delayed 4 lane overpass at Tx6 & FM185. Traffic there backs up mornin & evenin....even mid afternoon a bit.
OH...& justa reminder...
Tomorro is April 1st...not today
TxDOT sez 4 years to finish replacing both bridges.....so expect at least 5.
All traffic will be routed to 1 bridge..probably the southbound side.
Speegleville Rd & China Spring FM1637 will undoubtedly bear the brunt of traffic increases. At least China Spring was 4 laned from FM185 into Waco...but the 185 bridge is still 2 lanes. Speegleville to US84 nope..still 2 lanes with plenty of mornin & evenin traffic
The next project should be the long delayed 4 lane overpass at Tx6 & FM185. Traffic there backs up mornin & evenin....even mid afternoon a bit.
OH...& justa reminder...
Tomorro is April 1st...not today